2026 Midterm ElectionsElection Day: Tuesday, Nov. 3Election tracker ›

MBTA Closures and Shuttle Buses: November 2026 Schedule

Updated Oct. 29, 2026, from the MBTA’s live service alerts. We refresh this page every week, and again when the MBTA announces new diversions.

Nov. 7–15
Green Line shutdown, North Station to Kenmore and beyond
Nov. 20–22
Red Line shuttles, Broadway to North Quincy
Nov. 14–15
Blue Line single-tracking at Wonderland
617-222-3200
MBTA customer support

This page lists every planned MBTA subway and Commuter Rail closure, shuttle bus diversion and long-term station closure we know about for the next several weeks. It’s built from the MBTA’s own service alerts. For a delay right now, check mbta.com/alerts or the station signs. Plans can change because of weather or work schedules.

Quick explainer: A “diversion” means the MBTA swaps trains for free shuttle buses on part of a line, usually so crews can work on track, signals or stations.

Planned closures and shuttles

DatesLineWhat changes
Sat.–Sun., Oct. 31 – Nov. 1Green LineShuttle buses replace trains between North Station and Babcock Street, Kenmore and Heath Street
Through Nov. 7Green Line C BranchOutbound trains skip Saint Paul Street and Hawes Street
Fri., Nov. 6, and Mon., Nov. 9Commuter RailGreenbush and Kingston trains end at Braintree; Needham trains end at Forest Hills
Sat.–Sun., Nov. 7 – 8Commuter RailHaverhill Line: shuttles between Reading and Oak Grove. Framingham/Worcester Line: shuttles between Framingham and Boston. North Wilmington closed
Sat., Nov. 7 – Sun., Nov. 15Green LineShuttle buses between North Station and Babcock Street, Cleveland Circle, Kenmore and Heath Street
Sat.–Sun., Nov. 14 – 15Blue LineSingle-tracking near Wonderland, so expect longer waits
Fri., Nov. 20 – Sun., Nov. 22Red LineShuttle buses between Broadway and North Quincy
Until 2029Green Line E BranchSymphony station closed for accessibility work; use Northeastern or Prudential
Source: MBTA V3 API service alerts, retrieved Oct. 29, 2026. Shuttle buses are free and accessible.
Days with planned weekend or weekday service changes, Oct. 31 to Nov. 30, 2026
Green Line11 daysCommuter Rail4 daysRed Line3 daysBlue Line2 days
The Boston Report’s count of calendar days covered by each line’s planned shutdowns, shuttles or single-tracking. Ongoing station closures are not counted. Source: MBTA V3 API service alerts, retrieved Oct. 29, 2026; chart: The Boston Report.

What the data shows

By our count, the Green Line has the most disruption this month, with 11 days of planned shuttles. That includes a nine-day stretch, Nov. 7–15, that cuts the central subway between North Station and Kenmore. Riders on the B, C, D and E branches should plan on extra time or a different route then. The Orange Line from North Station or the Red Line from Park Street can work for some trips. The Red Line’s Nov. 20–22 shuttles affect riders south of Broadway, including JFK/UMass and North Quincy. Our explainer on why the MBTA is slow and what’s being fixed covers the work behind these closures.

Why does the MBTA shut down whole sections at once?

A full shutdown lets crews do weeks of overnight work in a few days, such as track, signal and power upgrades, so slow zones get fixed faster. The MBTA has relied on these “diversions” since its 2023 Track Improvement Program.

Accessibility: elevators and station access

Elevators 869 and 803 are listed as out of service through Dec. 1, 2026. The MBTA’s alerts page lists the alternate accessible route for each one. Riders who need step-free access should check mbta.com/alerts/accessibility before a trip, or call the MBTA at 617-222-3200.

Getting around during a shutdown

Related coverage

Frequently asked questions

Is the Green Line shut down in November 2026?

Yes, in parts. Shuttle buses replace trains between North Station and Kenmore, Babcock Street and Heath Street on Oct. 31 – Nov. 1, and again from Nov. 7 to Nov. 15, when Cleveland Circle is included too.

When is the Red Line shut down?

Shuttle buses replace Red Line trains between Broadway and North Quincy from Friday, Nov. 20, through Sunday, Nov. 22, 2026.

Are MBTA shuttle buses free?

Yes. Shuttle buses that replace trains during planned diversions are free and accessible.

Is Symphony station closed?

Yes. Symphony on the Green Line E Branch is closed for accessibility work, and the MBTA lists the closure as lasting until 2029.

How do I check MBTA delays right now?

Use mbta.com/alerts, the MBTA’s T-Alerts, or call 617-222-3200. This page covers planned work, not live delays.

Sources

Additional sources

Featured image: Photo: 4300streetcar, Wikimedia Commons, CC BY 4.0.

Get The Boston Report newsletter

The Boston Report Briefing: a free weekly email with five important stories, election updates, local data and our latest investigations.

Free. We email you a link to confirm first. Unsubscribe anytime. Privacy Policy